■ After the storage period of newly purchased parts exceeds 6 months, attention should be paid to their weldability before use. It is recommended to store in vacuum packaging.
■ Drill out the hot hole on the PCB and fill the solder.
■ Reflow welding is preferred for bottom welding, please refer to Reflow introduction
■ The manual welding wire should be used under the constant temperature condition of 350 degrees or below, and the welding time should be controlled within 5 seconds.
■ In order to meet the requirements of the drawings, a radiator of sufficient size must be installed.
■ Add air cooling or water cooling if necessary.
◆ Description:
■ Custom designed RF attenuators, RF resistors and RF terminals are available.