■ After the storage period of newly purchased parts exceeds 6 months, attention should be paid to their weldability before use. It is recommended to store in vacuum packaging.
■ Drill out the hot hole on the PCB and fill the solder.
■ Reflow welding is preferred for bottom welding, please refer to Reflow introduction
■ In order to meet the requirements of the drawings, a radiator of sufficient size must be installed.
■ Add air cooling or water cooling if necessary.
◆ Instructions:
■ Custom designed RF attenuators, RF resistors and RF terminals are available.
■ In order to meet the requirements of the drawing, it is necessary to install a sufficiently large radiator. Metal surfaces and radiators need to be coated with a very thin layer of thermal grease.
■ Add air cooling or water cooling if necessary.