The length of lead wire can meet the customer's requirements
Size Tolerance:5% unless otherwise stated
■ After the storage period of newly purchased components exceeds 6 months, attention should be paid to weldability before use. Storage is recommended for storage after vacuum packaging.
■ The best heat conduction is required on the ground surface.
■ Manual welding lead out should be used at or less than 350 degrees of constant temperature solder iron, welding time controlled in 5 seconds.
■ In order to satisfy the drawings, it is necessary to install a large enough radiator. The metal surface and radiator need to be coated with a very thin layer of thermal conductive silicone grease.
■ If necessary, add air cooling or water cooling.
◆ Explain:
■ Custom designs available RF Attenuators and RF Resistors and RF Terminations.